Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1908.6
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Apr 21, 2023     Avionics and Electrical - (5.5 hours) Category: Avionics
Ordered mygoflight iPad mount so I can figure out the best place to mount it.

Opened and inspected the remaining parts from B&C.

Weighed wire we measured earlier this week. I will use this information to understand the weight penalty for using shielded cables instead of individual wires.

Looked up specs for temperature and heat gun nozzles to use on solder sleeves. Looked up specs on standard density d-sub contacts. Looked up specs to decide which wire stripper to use. Tested use of solder sleeves on both gigaflight CAN bus cable and twisted shielded pairs. Terminated 20, 22, and a pair of 24 AWG wires into M39029/63-368 and M39029/63-369 standard density contacts.

Installed test contacts into male and female D-Sub connectors.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.